COURSES
Cert III in Wall and Ceiling Lining - CPC31220

Cert III in Wall and Ceiling Lining
Course code: CPC31220
This qualification provides a trade outcome in wall and ceiling lining for residential and commercial construction work.
The qualification has a core unit of competency requirements that cover common skills for the construction industry, as well as the specialist field of work wall and ceiling liner. Wall and ceiling liners apply and fix linings for non-structural walls and ceilings.
Occupational titles may include:
- Wall and ceiling liner
- Drywaller
- Plasterer
ENTRY REQUIREMENTS
- Basic computer skills
- English Proficiency level for the training course reading, writing and comprehension skills
- IELTS 5.5 or equivalent
- Minimum 18 years of age
HOW TO APPLY
For further information please contact the College and speak to our friendly Admissions Team:
Email: admin@camdencollege.edu.au
or
Online Enrolment
MODES OF DELIVERY
- Online
- Classroom
- Simulated work environment
- Distance
- Duration 52 weeks
- Online Learning
COURSE DELIVERY
The qualification offers a maximum period of 52 weeks (including 4 weeks holiday) from the date of commencement in which to complete their studies and submit all work for assessment. Stu- dents will attend face-to-face 2 x days per week 9am-5pm. This includes training and assessment. In addition students are required to complete up to a maximum of 5 hours per week independent, unsupervised activities.
RPL CANDIDATE
Candidates must provide evidence of currency and experience by working in a management role for a minimum of 12 months within the past 18 months. A letter on company letterhead from current/past employer(s) verifying this is required.
RECOGNITION OF PRIOR LEARNING
RPL (Recognition of Prior Learning) means an assessment process that assesses the competen- cy(s) of an individual that they may have been acquired through formal, non-formal and informal learning to determine the extent to which that individual meets the requirements specified in the training package.
UNITS OF COMPETENCY
UNITS | TITLE | UNITS | TITLE |
---|---|---|---|
CPCCCA3014 | Construct and install bulkheads | CPCCPB3010 | Manually sand plaster work |
PCCCA3026 | Assemble partitions | CPCCPB3009 | Finish plasterboard joints manually |
CPCCCM2012 | Work safely at heights | CPCCPB3008 | Mix plastering compounds |
CPCCOM1012 | Work effectively and sustainably in the construction industry | CPCCPB3007 | Apply levels of finish standards to planning and inspection of own work |
CPCCOM1013 | Plan and organise work | CPCCPB3006 | Fix fibre cement board |
CPCCOM1014 | Conduct workplace communication | CPCCPB3005 | Fix ceiling sheets to external protected areas |
CPCCOM1015 | Carry out measurements and calculations | CPCCPB3004 | Fix wet area sheets |
CPCCOM2001 | Read and interpret plans and specifications | BSBESB301 | Investigate business opportunities |
CPCCPB3001 | Fix standard plasterboard wall sheets | BSBESB407 | Manage finances for new business ventures |
CPCCPB3002 | Fix standard plasterboard ceiling sheets | CPCCCM2006 | Apply basic levelling procedures |
CPCCPB3003 | Fix battens | CPCCCA3001 | Carry out general demolition of minor building structures |
CPCCWHS2001 | Apply WHS requirements, policies and procedures in the construction industry | CPCCPB3018 | Use vacuum and electric sanding equipment to finish plaster work |
CPCCWC3004 | Install suspended ceilings | CPCCCM2008 | Erect and dismantle restricted height scaffolding |
CPCCWC3003 | Install dry wall passive fire-rated systems | CPCCPB3020 | Match, mitre and install cast ornamental cornices |
CPCCPB3012 | Cut and fix paper-faced cornices |


PARTNERS









